Fewer color changeovers, increased efficiency – the optimized production control system using flexis APS contributes to increased productivity in the Audi plant in Ingolstadt.

Investment was amortized in under 5 months.

Audi AG in Ingolstadt was able to reduce its operating costs significantly. The scheduled color changeovers were reduced by more than 90 per cent as a result of using flexis APS. This not only meant a decrease in costs and less paint consumption, but also increased productivity. The investment was amortized in just over 4 months.


Heinz Braun
Director, Production Control